Services Solutions Configure Work Start a Project
Project Work

Defined scope. Fixed price. Delivered.

Representative project examples showing how PES packages translate from intake to commissioned facility — across food & beverage, dairy, and pulp & paper.

Cheese and dairy production facility
Dairy & Cheese

Midwest Natural Cheese Greenfield

90,000 sq ft · 40,000 lb/day · Central Wisconsin
Cheese & Dairy Greenfield Package · $18.4M lump sum

A regional dairy cooperative needed a new natural and process cheese facility — designed, permitted, and commissioned as a single fixed-price engagement. PES delivered all seven disciplines under one contract, with utility systems pre-matched to process loads from day one.

$18.4M Lump sum
28 wks Engineering
OEE 91% Commissioning result
  • Vat room, aging cave, and packaging hall — single integrated layout
  • Ammonia refrigeration and glycol distribution, pre-sized to process load
  • CIP system fully integrated with PLC/SCADA controls architecture
  • USDA HACCP zone layout, air classification, and floor drainage design
  • Completed 3 weeks ahead of milestone — no change orders issued
Process Packaging Electrical Controls & MES HVAC + Refrigeration Civil/Structural

"Having one contract for all seven disciplines eliminated the finger-pointing we'd seen on every project before this. When a utility didn't match a process load, there was one team responsible for fixing it — and they did."

— VP of Operations, Regional Dairy Cooperative
Configure a Similar Package
Beverage bottling and filling line
Beverage & Brewing

Craft Beverage Line Addition — Hot-Fill PET

Line addition · 240 BPM · Pacific Northwest
Beverage Fill & Pack Package · $4.1M lump sum

A growing craft tea and juice producer needed a hot-fill PET line added to an existing facility — with minimal production disruption. The PES package covered every element from filler specification through palletizer integration, electrical tie-in, CIP, and controls update — all scoped and priced before the contractor was engaged.

$4.1M Lump sum
16 wks Engineering
OEE 88% At 90-day mark
  • Line balance model developed prior to OEM engagement — equipment selected to hit target OEE
  • Hot-fill filler, tunnel cooler, labeler, case packer, and palletizer integration
  • Electrical tie-in to existing MCC with load validation and arc flash study update
  • CIP loop redesign to serve both existing and new line from shared CIP skid
  • Line commissioned over a single 10-day planned shutdown — on schedule
Process Packaging Electrical Controls HVAC

"We'd been quoted 6 weeks just to get a proposal from a traditional firm. PES came back in 72 hours with a fixed price and a scope we could hand directly to our CFO."

— Plant Engineering Manager, Craft Beverage Producer
Configure a Similar Package
Pickle and condiment jar filling line
Condiments & Pickles

Pickle & Relish Line — Brownfield Integration

Line addition · 45 jars/min · Ohio
Pickle & Condiment Package · $3.3M lump sum

A mid-size pickle and relish producer needed a new glass jar line integrated into an aging facility with constrained utilities and limited floor space. The PES package was scoped to work within existing electrical capacity, optimize the floor layout for throughput, and include brine batching, CIP, USDA zoning, and pasteurization as a single fixed-price scope.

$3.3M Lump sum
14 wks Engineering
Zero CO Change orders
  • Brine/vinegar batching, blending tank, and in-line pH monitoring
  • Glass jar filler, lidder, vacuum sealer, and tunnel pasteurizer specification
  • USDA zone layout, floor drain redesign, and waste stream (brine) management
  • Electrical load analysis confirmed existing MCC capacity — avoided $280K substation upgrade
  • PLC/HMI tied into existing SCADA without platform migration
Process Packaging Electrical Controls HVAC

"The electrical load analysis alone saved us more than $280K on a substation we didn't need. That's the difference between an integrated scope and a discipline-by-discipline approach."

— Capital Projects Manager, CPG Food Company
Configure a Similar Package
Industrial packaging and converting line
Pulp & Paper · Corrugated

Corrugated Converting Facility — Greenfield

New facility · Single-facer + converting · Southeast US
Corrugated Box Greenfield Package · $26.2M lump sum

A regional packaging company expanding into corrugated needed a complete new facility — corrugator hall, converting floor, starch system, warehouse, dock, and all utilities — designed for 24/7 operation and commissioned as a single fixed-price contract. The PES package integrated all seven disciplines from site through production startup.

$26.2M Lump sum
30 wks Engineering
On budget Delivered
  • Corrugator hall layout, single-facer line, and converting floor with multi-line flexibility
  • Starch preparation system, ink mixing room, and roll storage design
  • Facility-wide dust collection — corrugator, converting, and trim systems
  • Full MES and plant controls architecture — single-pane visibility across all lines
  • Warehouse dock design with AGV pathway integration pre-conditioned in floor slab
Process Converting Electrical Controls + MES HVAC + Dust Civil/Structural

"We'd never built a corrugated facility before. A single contract covering everything — from site prep to the first board out the door — let our team stay focused on operations, not managing 12 different contractors."

— CEO, Independent Packaging Company
Configure a Similar Package

See what your project would look like.

Use the configurator to match your project to a base package and get a fixed-price range in under two minutes — or submit an intake and we'll scope it for you.

Configure a Package Start a Project